Here we designed and installed the whole installation of this industrial building right from the beginning to suit the needs of the client and to get the best out of the space available.

The installation required a three phase electricity supply, although the building currently only had an existing single phase supply which ran into the client’s nearby domestic house. We therefore organised and arranged a new three phase supply from Western Power to eliminate all hassle for the owner.

We buried armoured cables into the ground, prior to a concrete slab being fitted to ensure the installation was as tidy as possible and without any visible cables. Other cabling required for the sockets and lights were installed before the internal cladding was put up. Again, to make the installation tidy and discrete.

The barn has three electric doors all controlled individually as well as a three-phase car ramp. All external lights were low wattage LED flood lights for supreme efficiency. These are all controlled by motion sensitive PIR’s. Additional override switches were added to the PIR circuits in case the lights are needed for a long period of time.

 Electric Doors, LED controlled sensored lighting Electric Doors, LED controlled sensored lighting
 Electric Doors, LED controlled sensored lighting Electric Doors, LED controlled sensored lighting